A total of approximately 14 MWp, of which 9 MW produced through the Renewability Consortium.
AFV Beltrame Group is developing projects related to the procurement of green energy, through direct investment in renewable energy production plants for self-consumption and through the signing of green energy purchase agreements (PPA – Power Purchase Agreement).
The initiatives will enter into service between 2023 and 2024, for a total of approximately 14 MWp (of which 9 MW produced through the Renewability Consortium) of photovoltaic plants that will make it possible to reduce indirect Scope 2 emissions. Thanks to these projects, about 4% of the annual electricity consumed will come from renewable sources.
San Giovanni Valdarno
1,6 MW photovoltaic system located on the roof of the San Giovanni Valdarno plant consists of 2,970 photovoltaic modules that are spread over a total area of 11,000 m2. The photovoltaic system will be able to produce about 2 GWh/ year of renewable energy of which more than 70% will be self-consumed by the production plant, this will allow a reduction of energy withdrawal from the network of about 20%. The plant went into operation at the beginning of 2024.
Sirio
3.3 MW ground photovoltaic system composed of more than 6,100 high efficiency photovoltaic modules with horizontal axis tracker technology located in the province of Mantua. The plant, which came into operation in July 2023, will produce about 5 GWh/year. The renewable electricity produced by the plant will be supplied to AFV Beltrame by signing a PPA contract with the company that owns the plant.