                                                                                                                                                                                                                                                                                                                                                                                                {"id":24718,"date":"2024-09-02T13:19:36","date_gmt":"2024-09-02T11:19:36","guid":{"rendered":"https:\/\/gruppobeltrame.com\/?p=24718"},"modified":"2024-09-02T13:19:36","modified_gmt":"2024-09-02T11:19:36","slug":"lavori-completati-durante-la-pausa-estiva","status":"publish","type":"post","link":"https:\/\/gruppobeltrame.com\/en\/lavori-completati-durante-la-pausa-estiva\/","title":{"rendered":"Works completed during the summer shutdown"},"content":{"rendered":"<p><\/p>\n<p>September: a new beginning! Although, during the summer shutdown, we never stopped. Here are some of the most important works we completed at the Vicenza plant:<\/p>\n<p>&#8211; CC2 transfer wagon: elimination of the hydraulic control unit mounted on board;<br \/>\n&#8211; Shear cmp: replacement with a more modern, high-performance machine;<br \/>\n&#8211; Flue gas plant cyclone: replacement of a significant part of the flue gas treatment plant that will allow optimisation of aeraulic performance;<br \/>\n&#8211; First rain plant: doubled the capacity for treating first rain water with a high quality plant;<br \/>\n&#8211; Furnace revolving sector: a new revolving sector for our EAF furnace, equal to the previous one in form and function but strengthened in substance to face the challenges of the future;<br \/>\n&#8211; Simac mat: replacement of the Simac train cage change mat;<br \/>\n&#8211; cc1 rotary table: replacement of this piece of via rollers evacuating steel mill castings (billets are sorted for various destinations with this machine);<br \/>\n&#8211; cc2-cc3 vapour extractors: new installations.<\/p>\n<p>But much more works are nearing completion!<\/p>\n<p>Stay tuned!<\/p>","protected":false},"excerpt":{"rendered":"<p>September: a new beginning! Although, during the summer shutdown, we never stopped. Here are some of the most important works we completed at the Vicenza plant: &#8211; CC2 transfer wagon: elimination of the hydraulic control unit mounted on board; &#8211; Shear cmp: replacement with a more modern, high-performance machine; &#8211; Flue gas plant cyclone: replacement [&hellip;]<\/p>\n","protected":false},"author":180,"featured_media":24719,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts\/24718"}],"collection":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/users\/180"}],"replies":[{"embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/comments?post=24718"}],"version-history":[{"count":1,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts\/24718\/revisions"}],"predecessor-version":[{"id":24720,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts\/24718\/revisions\/24720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/media\/24719"}],"wp:attachment":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/media?parent=24718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/categories?post=24718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/tags?post=24718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}