                                                                                                                                                                                                                                                                                                                                                                                                {"id":24110,"date":"2024-07-11T16:45:32","date_gmt":"2024-07-11T14:45:32","guid":{"rendered":"https:\/\/gruppobeltrame.com\/?p=24110"},"modified":"2024-07-11T16:47:15","modified_gmt":"2024-07-11T14:47:15","slug":"stahl-gerlafingen-ha-firmato-con-aew-energie-ag-un-nuovo-contratto-per-la-realizzazione-di-un-ulteriore-impianto-fotovoltaico","status":"publish","type":"post","link":"https:\/\/gruppobeltrame.com\/en\/stahl-gerlafingen-ha-firmato-con-aew-energie-ag-un-nuovo-contratto-per-la-realizzazione-di-un-ulteriore-impianto-fotovoltaico\/","title":{"rendered":"Stahl Gerlafingen signed with AEW Energie AG, a new contract for the realization of an additional photovoltaic plant"},"content":{"rendered":"<p><br \/>\nOur Swiss company, Stahl Gerlafingen signed with AEW Energie AG, a new contract for the realization of an additional photovoltaic plant on the roof of the warehouse sud. <\/p>\n<p>The plant consists of approximately 6300 panels, has a power of 2.8 MWp and produces an amount of energy equivalent to the annual consumption of 650 households!<\/p>\n<p>The commissioning is scheduled within October 2024. The whole produced energy will be used internally for the steel production. <\/p>\n<p>This plant adds to the previous 2.2 MWp plant which came into operation in May and represent a further step in the decarbonisation strategy of the group.<\/p>\n<p>Thanks to AEW Energie AG for this new collaboration.<\/p>","protected":false},"excerpt":{"rendered":"<p>Our Swiss company, Stahl Gerlafingen signed with AEW Energie AG, a new contract for the realization of an additional photovoltaic plant on the roof of the warehouse sud. The plant consists of approximately 6300 panels, has a power of 2.8 MWp and produces an amount of energy equivalent to the annual consumption of 650 households! [&hellip;]<\/p>\n","protected":false},"author":180,"featured_media":24111,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[84,1],"tags":[],"_links":{"self":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts\/24110"}],"collection":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/users\/180"}],"replies":[{"embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/comments?post=24110"}],"version-history":[{"count":1,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts\/24110\/revisions"}],"predecessor-version":[{"id":24112,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/posts\/24110\/revisions\/24112"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/media\/24111"}],"wp:attachment":[{"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/media?parent=24110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/categories?post=24110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gruppobeltrame.com\/en\/wp-json\/wp\/v2\/tags?post=24110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}